Access the Full Project by Clicking here!
Bidjugde
JOB
ITB RS 26 32 New River Estates Drainage Improvements
BID DATE
06/24/26 - 7:00
AGENCY
Davie
ESTIMATE
n/a
SCOPE
The Project consists of Stormwater collection and discharge improvements in SW 48th Street, SW 55th Avenue, SW 54th Terrace, and a portion of the vacant right-of-way between 55th Avenue and 54th Terrace. The Project area is bounded by Griffin Road on the north, SW 49th Street on the south, SW 52nd Avenue on the east, and Wilson Road on the west, in Section 26, Township 50 South, Range 41 East. The Project consists of the demolition and removal of existing drainage pipelines, manholes and catch basins, as well as the construction of new underground HDPE drainage pipelines, in various diameters, and concrete catch basins and manholes. It also includes the relocation of watermains, and construction of a control structure and HDPE pipe, and RIP-RAP top of bank on the Sunny Lake east berm. Stormwater discharges to the east into the S-4 Canal and construction of a RIP-RAP headwall and installation of a 48-inch flap gate are required. Stormwater discharges to the east into the S-2 Canal and construction of pipe extension and RIP-RAP headwall, and installation of a 36-inch flap gate are required. The Project also requires that road elevations be raised in limited areas, and asphalt, swales and grass restoration in general, and relocation of watermain segments. https://procurement.opengov.com/portal/davie-fl/projects/158993
PREBID
6/1/2026 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT