Access the Full Project by Clicking here!
Bidjugde
JOB
Regional Reuse System Phase 2
BID DATE
06/30/26 - 3:00
AGENCY
Santa Rosa County
ESTIMATE
n/a
SCOPE
The completed Work will provide Owner with a new reclaimed water pump station and associated force main to convey reclaimed water from the Navarre Beach WWTF to the Intermediate Pump Station located at the Holley Navarre WWTF. The completed Work will also provide the Owner with a new Tertiary Filtration system, five additional Rapid Infiltration Basins (RIBs) on the Eglin RIBs facility, as well as other miscellaneous improvements at the WWTF. The major items of the Work to be performed under this Contract include: 1. Preparation and submission of submittals for review and approval. 2. Installation of a new reclaimed water pump station including two conjoining wet wells with three submersible pumps and associated piping with room for an additional pump and pipe to be installed at a later date. 3. Upgrades to the existing reclaimed water pump station at the Holley Navarre Wastewater Treatment Facility. 4. Installation of a new tertiary filter system in place of the existing. 5. Obtaining construction stormwater permit from the Florida Department of Environmental Protection, implementation of a construction best management practices plan (CBMPP) for erosion and sediment control, monitoring and maintenance of the erosion control measures. 6.Installation of a C-900 and Ductile Iron Pipe Reclaimed Water Force Main via horizontal directional drilling (HDD), horizontal auger boring, and open cut. 7. Construction of five new RIBs at the Eglin RIBs Facility. 8. Restoration to include final grading and grassing and stabilization of other areas where disturbed by work completed as part of this Project. https://procurement.opengov.com/portal/santarosafl/projects/149633/document?section=1355835
PREBID
5/28/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT