Access the Full Project by Clicking here!
Bidjugde
JOB
5th Murphy Waterline Replacement
BID DATE
06/10/26 - 7:00
AGENCY
Taylor
ESTIMATE
n/a
SCOPE
Installation of 1107 LF of 8” PVC waterline along the 5th and Murphy Street in Taylor, TX. Includes: site prep work; erosion and sediment control; trenching and backfill; water main construction; installation of water main valves; installation of a fire hydrant; installation of air release valve and automatic flushing valves; utility construction; and all other work required in accordance with the plans and specifications. https://www.civcastusa.com/project/6a09d4cde1548e96c8f2edbb/summary lisa.singer@hdrinc.com
PREBID
5/26/2026 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT