Access the Full Project by Clicking here!
Bidjugde
JOB
Carey Ave 36 Inch Water Main Corrosion Protection
BID DATE
06/4/26 - 5:30
AGENCY
North Las Vegas
ESTIMATE
$1,300,000
SCOPE
The Work involves installing 29 test stations along Carey Avenue on the existing 36-inch water line that involves testing of the entire system to verify continuity of the protection system along with construction and testing at three (3) additional sites designated as: Rectifier Site 1 – Central Reservoir; Rectifier Site 3 – P2 Pump Station; and, Rectifier Site 4 – P2B Reservoir. fajardoa@cityofnorthlasvegas.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT