Access the Full Project by Clicking here!
Bidjugde
JOB
EMC Cory Wride Phase 2 South Lot
BID DATE
06/8/26 - 5:00
AGENCY
Eagle Mountain
ESTIMATE
n/a
SCOPE
The project is located west of the existing pedestrian crossing in the roadway, south of the baseball fields, within the designated south parking lot area, including the retention pond. Work includes site demolition, clearing and grubbing, and removal of existing asphalt, concrete, curb and gutter, vegetation, and miscellaneous site features within the limits of disturbance. The project also includes stripping, stockpiling, and reuse of topsoil, site grading and earthwork, and implementation of erosion control and SWPPP measures in accordance with City and applicable standards. https://utah.bonfirehub.com/opportunities/236397 Myates@eaglemountain.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT