RFQ Del Rio Northside Sewer Line Phase I
BID DATE
06/26/26 - 7:00
AGENCY
Del Rio
ESTIMATE
n/a
SCOPE
Construction of sanitary sewer collection system pipeline & components replacing existing sanitary sewer infrastructure including approximately 37,600 LF total (6,600 LF for Phase I) of wastewater gravity mains and associated sitework as shown in the drawings. The project will include all pipes, manholes, encasements, lateral connections, surface restoration including pavement, testing, SWPPP measures, traffic control, and related material & procedures as outlined in the construction plans and specifications. https://www.cityofdelrio.com/Home/Components/RFP/RFP/430/163