New York Avenue Main Replacement Phase II
BID DATE
05/28/26 - 7:00
AGENCY
Fair Oaks WD
ESTIMATE
n/a
SCOPE
Construction of approximately 1,525 linear feet of new 12-inch ductile iron water main along New York Avenue between Monal Court and north of Lemon Street. The 12-inch ductile iron pipe has been pre-purchased by the District and will be provided to the awarded contractor. The project includes installation of five (5) fire hydrants, two (2) air release valves, and one (1) 4-inch blowoff per FOWD standard specifications. There are eight (8) point of connection tie-ins to the existing distribution system as detailed on the improvement plans. Paving and surface restoration is to be performed per Sacramento County specifications and requirements. New service lines for eleven (11) existing water services ranging from one to two-inches will be installed and reconnected to the existing water meters. The existing 10 and 12-inch steel water main and all appurtenances are to be abandoned per FOWD plans and standard specifications and Sacramento County specifications and requirements. https://www.fowd.com/projects-and-bids

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT