Access the Full Project by Clicking here!
Bidjugde
JOB
Quartzsite-Wickenburg Hwy (TEA-HSIP-060-A(201)A)
BID DATE
11/4/11 - 11:00 LIVE! REAL-TIME
AGENCY
ADOT
ESTIMATE
$2,653,000
SCOPE
The proposed work is located on US 60 in the Town of Wickenburg, in Maricopa County, and consists of roadway widening for a two-way left turn lane, and construction of a shared-use path. The project limits extend from Vulture Mine Road (MP 107.70) to Los Altos Drive (MP 108.95). The project includes minor demolition, addition of 12 feet of pavement width, curb and gutter, sidewalk, signing and pavement marking modifications, and drainage improvements. The project also includes construction of an asphaltic concrete shared-use path, including pedestrian ramps, handrail, retaining walls, drainage improvements, and other related work.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT