Faulconbridge Road 5749 Storm Drainage Improvement
BID DATE
05/28/26 - 3:00
AGENCY
Charlotte
ESTIMATE
$941,629
SCOPE
Faulconbridge Rd 5749 will include the lining 556 LF of 42 inch CMP and 227 LF of 15 inch RCP with CIPP. Eight existing drainage structures will be removed and replaced and two additional structures will be added. 125 LF of 15" RCP will be removed and replaced. Chemical grouting joint repair will also be installed at approximately 20 locations throughout the 42" CMP. https://charlottenc.bonfirehub.com/opportunities/234788 katherine.osborne@charlottenc.gov