Access the Full Project by Clicking here!
Bidjugde
JOB
SCOP Boston Hwy Phase 1 II US 19 S Gilley
BID DATE
06/4/26 - 8:00
AGENCY
Jefferson County FL
ESTIMATE
n/a
SCOPE
This project is for the construction services for widening and resurfacing and widening of CR 149 Boston Highway from SR 57 (US 319) FL/GA Parkway to Still Road. The scope will include (2) 12' travel lanes and 3' paved shoulders. Drainage improvements will include evaluating all driveway side drain pipes and miter-end sections due to their condition and to keep drainage connectivity, as needed. Signage exists within the project limits and will be evaluated to determine the need for additional signs, correcting redundant or conflicting signage and the replacement of existing signage, as needed. New thermoplastic striping and RPM's will also be included in the project. All work will be completed within existing right of way. https://www.jeffersoncountyfl.gov/p/procurement-opportunities jtuten@jeffersoncountyfl.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT