Access the Full Project by Clicking here!
Bidjugde
JOB
Juniper Canyon Recreation Area Phase 3
BID DATE
05/26/26 - 8:00
AGENCY
Herriman
ESTIMATE
n/a
SCOPE
The construction of the Juniper Canyon Recreation Area Phase 3 Project, including construction of the Juniper Canyon Eastern Trailhead and Juniper Canyon multi-use trails. The project includes but is not limited to excavation and grading for parking lot and trails, including sloped hillsides, construction of asphalt trails, concrete curb/gutter, sidewalk, drive approach, ADA pedestrian ramps, walk ways, recycled asphalt parking lot (with HMA Paving as Bid Alternate), signage and striping, storm drainage, 2” water supply, 1” water supply, water line and hydrants for bike park, fire hydrant, vinyl privacy fence, asphalt tie in to existing road, stone dust/crusher fines surfacing, rock walls, site amenities (bike racks, bike repair stations, picnic tables, trash receptacles, landscape and sitting boulders), timber pole fence, trail gates, informational kiosk, pavilion installation - footings and site prep (owner supplied pavilion), restroom site prep, water supply, sewer service, electric service, radiant floor heat system, rough plumbing, final utility connections (owner supplied and delivered pre-fabricated CXT restroom), camera pole, site lighting, drainage culvert, natural landscape restoration and seeding, landscape plantings, rock mulch, weed barrier, and irrigation system. https://www.herriman.gov/public-notices.php#bidsproposals

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT