CNG Fuel Facility Upgrades (REBID)
BID DATE
10/17/16 - 2:00
AGENCY
Santa Fe
ESTIMATE
n/a
SCOPE
NO BIDS RECEIVED THE FIRST TIME. includes earthwork, grading and compaction of undeveloped portions of the City Yards site to form a new fueling area., expansion of the existing storm water detention pond, construction of new concrete fuel islands and parking stalls for Environmental Services Division, new subsurface storm water infrastructure, including drains, pipes and an oil-water separator, demolition of portions of existing CNG compressor station building to facilitate addition and installation of new equipment, a new one-story addition to the existing CNG compressor station, a new public fuel island. modifications to existing canopy structures in the Transit Yard to facilitate the installation of new fueling infrastructure. a new fueling island within the existing Transit Yard, new concrete foundations for pre-engineered canopy structures at the new public fuel island and the Transit Yard, construction of a complete CNG fueling system, including electrically-operated natural gas compressors, gas dryer, storage vessels, public-use CNG dispenser and fuel management terminal, fuel dispensers, fill posts and hoses for time-fill operations and other items as specified and as necessary to form a complete, functional installation, concrete and asphalt paving and patching, and electrical demolition, power, distribution and lighting, including a new primary electrical service and transformer. Construction of pre-engineered metal canopy over new fuel island in Transit Yard and public fuel island shall, if accepted by Owner, be constructed as Alternates to the Base Bid Work.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT