Access the Full Project by Clicking here!
Bidjugde
JOB
Dripping Springs South Collector Gravity Sewer LINE
BID DATE
05/29/26 - 3:00
AGENCY
Dripping Springs
ESTIMATE
n/a
SCOPE
The work to be performed includes furnishing all materials, equipment, tools, and labor necessary for the construction of approximately 6,100 linear feet of 30” to 48” gravity sewer line. The gravity main will cross FM 150 going southeast which will require two borings. The approximate length of the bores is 431 linear feet accompanied by 54” steel casings. Lastly, traffic control, protection of select trees, as well as livestock, along the new gravity line alignment will be required. https://www.civcastusa.com/project/69f231c89ad0738e55c7bb7a/summary ryan.shaw@burgessniple.com
PREBID
5/7/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT