Access the Full Project by Clicking here!
Bidjugde
JOB
2026 Combined Cured In Place Pipe CIPP Rehabilitation
BID DATE
05/14/26 - 7:00
AGENCY
Edmonds
ESTIMATE
$549,000
SCOPE
Installation of approximately 258 linear feet (LF) of 8-inch diameter cured-in-place (CIPP) structural liner, along with both pre-construction and post-construction Closed Circuit Television (CCTV) pipe inspection. Installation of approximately 690 linear LF of 8-inch diameter CIPP structural liner, along with both pre-construction and post-construction CCTV pipe inspection. Installation of approximately 15 LF of 8-inch diameter, 480 LF of 12-inch diameter, 520 LF of 15-inch diameter, and 150 LF of 18-inch diameter CIPP structural liner, along with both pre-construction and post-construction CCTV pipe inspection. This site will also include 20 LF of 12-inch diameter PVC and general restoration. http://bxwa.com/bxwa_toc/pub/2225/edm42_2026_combined_cured_in_p_81214/info.php russell.lynch@edmondswa.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT