Access the Full Project by Clicking here!
Bidjugde
JOB
FM 1173 Utility Relocation
BID DATE
06/18/26 - 3:00
AGENCY
Krum
ESTIMATE
n/a
SCOPE
Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: The relocation and rehabilitation of water and wastewater lines along FM 1173. This includes replacing 15,060 linear feet of water lines (12-inch, 8-inch, 6-inch,and 4-inch PVC DR 18 C900) and 7,460 linear feet of wastewater lines (8-inch and 12-inch PVC SDR 26/35 gravity sewer.) The project will involve a combination of open-cut, horizontal directional drilling (HDD), and potentially other trenchless methods to minimize disruption to traffic and the surrounding environment. New service connections will be installed, along with associated appurtenances such as valves, hydrants, and manholes. Additionally, the scope includes testing and disinfection of the new pipelines, as well as site restoration and traffic control measures to ensure public safety throughout the construction process. https://cityofkrum.com/doing-business/bidding-information/ jwinchester@parkhill.com
PREBID
6/4/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT