Access the Full Project by Clicking here!
Bidjugde
JOB
Light Ranch Water Transmission Main Phase 1a
BID DATE
05/8/26 - 7:00
AGENCY
Mustang Special Utility District
ESTIMATE
n/a
SCOPE
-Approximately 1,097 LF of 18” Water Line with all required fittings and restraints; -Approximately 9,650 LF of 12” Water Line with all required fittings and restraints; -Approximately 215 LF of 8” Water Line with all required fittings and restraints; -The installation of appurtenances including but not limited to; casings, fire hydrants, and valves; -The replacement of any damaged or disturbed property, including but not limited to property fences and graded drainage ways. https://www.civcastusa.com/project/69d96459d115847ff3eb529e/summary jcarothers@chasolutions.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT