Access the Full Project by Clicking here!
Bidjugde
JOB
Reams Road Improvement Project Summerlake Park Blvd Taborfield Ave
BID DATE
06/4/26 - 9:00
AGENCY
Orange County - FL
ESTIMATE
n/a
SCOPE
Includes the reconstruction of Reams Road from south of Summerlake Park Blvd. to Taborfield Avenue. The existing 2-lane rural roadway will be improved to a 4-lane divided urban facility with a paved trail on one side and a sidewalk along the other side. The project includes traffic signals at Oasis Cove Boulevard/Torcello Isle Drive, Floridian Place/Buena Place, Center Drive, Newmarket Drive/Bay Court, and Taborfield Avenue. Milling and resurfacing of the existing pavement east of Taborfield Avenue is required to remove existing transition striping. Drainage improvements, including the construction of six ponds, are a part of this project. The project length is approximately 16,848 linear feet (3.19 miles). UTILITY SCOPE Orange County Utilities work along Reams Road from south of Summerlake Park Boulevard to Taborfield Avenue consists of: replacement of approximately 15,000 linear feet of the County’s existing force main with new force main ranging in size from 4-inch to 24-inch, approximately 13,500 lineal feet of the County’s water main with new water main ranging in size from 8-inch to 24-inch, and approximately 6,000 lineal feet of the County’s reclaimed water main with new reclaimed water main ranging in size from 8-inch to 16-inch along the project corridor. https://procurement.opengov.com/portal/orangecountyfl/projects/259893/document?section=2491066 procurement-support@opengov.com
PREBID
5/5/2026 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT