Access the Full Project by Clicking here!
Bidjugde
JOB
Bobwhite Rd 30 Inch Water Main Phase 3
BID DATE
05/28/26 - 7:00
AGENCY
County Line Special Utility District (CLSUD)
ESTIMATE
$1,510,711
SCOPE
The Work consists of the installation of approximately 3,575 linear feet (LF) of 30-inch diameter HDPE water main conforming to AWWA C906 (DIPS, DR 11) via open-cut construction methods, including all associated appurtenances. An additional approximately 133 LF of 30-inch diameter pipe will be installed using trenchless construction methods. The proposed water main will connect to the existing 24-inch water main along FM 2720 and extend to the Bobwhite Road Pump Station. The pipeline will be constructed within a proposed 20-foot-wide easement generally aligned parallel to Bobwhite Road. https://www.civcastusa.com/project/69e8fce3ab56d7fe96712220/summary eaguirre@hwlochner.com
PREBID
5/14/2026 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT