Access the Full Project by Clicking here!
Bidjugde
JOB
Irvine Great Park Bosque Pedestrian Bridge CIP 322601
BID DATE
05/28/26 - 4:00
AGENCY
Irvine
ESTIMATE
$5,770,000
SCOPE
The work to be performed shall include, but not be limited to: Reinforced concrete bridge abutment construction; reinforced concrete bridge superstructure; bridge curb/barrier with stainless steel railing with incorporated safety lighting; accent lighting, electrical work; concrete approach slabs; signing; striping; clearing and grubbing; asphalt and concrete removal; unclassified excavation; miscellaneous base and structural backfill; fine grading; asphalt paving; water quality BMP installation; and other items not mentioned here, but are required by the plans and the specifications. https://vendors.planetbids.com/portal/15927/bo/bo-detail/141458 GreatParkBids@cityofirvine.org
PREBID
5/13/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT