Access the Full Project by Clicking here!
Bidjugde
JOB
School Street Regulator Replacement
BID DATE
05/18/26 - 7:30
AGENCY
Jerome
ESTIMATE
n/a
SCOPE
The work includes removal and replacement of the existing pressure reducing valve (PRV) system, installation of a new PRV with bypass capabilities, replacement of associated waterlines, installation of valves and appurtenances, and 6573882.1 all necessary connections to existing infrastructure. Additional work includes excavation, trenching, rock excavation as needed, traffic control, system testing, and site restoration. The project is intended to improve system reliability, stabilize water pressure, and enhance distribution performance for a significant portion of the Town. b.klein@jerome.az.gov KGinige@sec-landmgt.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT