Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) ONeil Drive Hubbard Peart Colorado Cottonwood Judi
BID DATE
05/19/26 - 7:00
AGENCY
Casa Grande
ESTIMATE
n/a
SCOPE
Construction of O’Neil Drive from it’s existing terminus at the Hubbard St alignment extending eastward to Peart Rd. • Ultimate condition will include: About 3000 LF of a collector street, including two through lanes, striped median, bike lanes, detached sidewalks, ADA, driveways, landscaping and street lighting o Provide improvements at Legacy Traditional School as described in the most recent RSA o Two intersections (w/ Colorado) o Temporary Retention Basins Construction Colorado St from Cottonwood Ln extending northward to the intersection of Colorado Street and Silver Reef St. • Ultimate condition will include: o About 3000 LF of a collector street, including two through lanes, striped median, bike lanes, detached sidewalks, ADA, driveways, landscaping and street lighting o Two intersections (w/ O’Neil) o Temporary retention basins https://casagrandeaz.gov/bids.aspx?bidID=75

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT