26 23 19th Street Drainage Repair
BID DATE
05/19/26 - 7:00
AGENCY
Huntsville
ESTIMATE
n/a
SCOPE
Construct a concrete structural support beam to stabilize 2 existing box culverts under 19th Street. Must be of appropriate size. Place approximately 150 cubic yards of common fill material to construct a concrete floor to establish positive drainage at the downstream outfall of the box culverts. Construct structural wing walls for erosion prevention and containment of flow. Place approximately 100 tons of 18” riprap for backfill and erosion prevention behind wingwalls and in front of concrete floor. All concrete construction shall be reinforced with rebar of appropriate size and spacing for the structure. A temporary construction easement has been obtained from the property owner to eliminate most of the work on the street side. The temporary working easement will need clearing before and restored after the construction. Restoration shall consist of leveling and hydroseeding the disturbed area. Erosion control such as silt fencing shall be in place during and after construction. Removing and replacing the existing handrail and sidewalk, if either is damaged during the project. Provide a written plan, explaining course of work, dimensions, and materials to be used for the project. An estimated timeline for the project shall be included. https://www.huntsvilletx.gov//Bids.aspx?BidID=399 purchasing@huntsvilletx.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT