Copper Creek Outfall Stabilization
BID DATE
05/12/26 - 7:00
AGENCY
Tigard
ESTIMATE
$740,000
SCOPE
Removal and replacement of approximately 150 linear feet of 8.5 to 10 feet wide asphalt path and base material over culverts. Removal of existing storm pipe culverts and support structures and 155 linear feet of chain link fencing. Installation of new box culvert. Installation of concrete cap on existing sanitary sewer line. Temporary Water Management during In-Water Work Window (IWWW). Erosion and sediment control. General excavation and slope stabilization. Creek bed restoration, step pool installation, and stream enhancement. Installation of gabion retaining wall and split-rail fence. Tree and invasive species removal. CWS Vegetated Corridor seeding, planting, and surface restoration, and maintenance period. https://www.tigard-or.gov/Home/Components/RFP/RFP/244/199 ContractsPurchasing@tigard-or.gov