Access the Full Project by Clicking here!
Bidjugde
JOB
2025 2026 Pavement Rehabilitation
BID DATE
05/19/26 - 4:00
AGENCY
Arcadia
ESTIMATE
n/a
SCOPE
The work to be done by the Contractor shall be to provide traffic control, 2-inch to 4-inch thick cold mill grind to roadway, apply tack coat, furnish and place 2-inch thick ARHM and HMA asphalt concrete, adjust sewer manhole rings/covers, adjust valve covers, remove and replace misc. PCC concrete sidewalk-curb and gutter-cross gutter/spandrel-driveway approach-ADA curb ramps, installation of ADA truncated dome pads, remove and replace 4-inch thick Asphalt Concrete deep patch, and the replace existing pavement markings, all in accordance with this project’s contract documents. https://www.arcadiaca.gov/government/administrative_services/bids_rfps.php?rz=bidDetails&id=62 Balanay@ArcadiaCA.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT