Access the Full Project by Clicking here!
Bidjugde
JOB
2026 04 NW 3rd Avenue Drainage Improvements
BID DATE
05/26/26 - 4:00
AGENCY
Wilton Manors
ESTIMATE
n/a
SCOPE
For improvements to NW 3rd Avenue. The project will require removing existing stormwater infrastructure on NW 3rd Avenue between NW 23rd Street an NW 20th Street and installing new 24”, 30”, and 36” drainage pipe and exfiltration trench, along with new drainage structures, a 24” in-line check valve, and other environmental control measures. The improvements to 1.83 acres of paved roadways will provide storm runoff attenuation and alleviate flooding. https://www.demandstar.com/app/limited/bids/527548/details

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT