Vintage Park Overcrossing
BID DATE
12/17/15 - 2:00
AGENCY
Foster City
ESTIMATE
n/a
SCOPE
The work includes providing all labor, material, and equipment necessary to remove and replace the concrete approach slabs, sidewalk, curb, gutter, and medians, and asphalt roadway at both the north and south ends of the bridge to bring the approach grades back to original as-built elevations. Involves the removal and replacement of the existing fill under the approach slab and roadway with lightweight fill. Limits of work are shown on the construction drawings. Work shall be completed within 154 Calendar Days from the date when Contract Time commences to run.
PREBID
12/8/2015 9:00