Access the Full Project by Clicking here!
Bidjugde
JOB
Gwinnett County Police Precinct North Parking Lot Improvements
BID DATE
05/19/26 - 8:00
AGENCY
Gwinnett County
ESTIMATE
n/a
SCOPE
The scope for this project includes asphalt surface improvements, concrete curb repair, and striping. As indicated on the design, sections of asphalt surfaces will be improved through full-depth removal, milling & overlay, and crack fill and sealing. The loose bollard in front of the dumpster must be reset. Any wheel stops, signs, and posts affected by construction must be securely reinstalled. Striping and other markings must be installed as indicated on the design. Reinstallation of the gate detection loops will be completed by another contractor and is not part of this project scope. Jake.Scarpone@GwinnettCounty.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT