Doty Road Water LINE Improvements
BID DATE
04/29/26 - 7:00
AGENCY
Mauriceville MUD
ESTIMATE
n/a
SCOPE
The project is generally described as the installation of a 12” steel casing and 6” water line crossing under the CPKC Railroad alongside Doty Road, along with all other necessary items shown in the plans and as required in the contract documents. Scope of Work: -Acquire any necessary permits; -Mobilize and prepare site; -Install traffic control; -Clear, grub and prepare right of way; -Install steel casing; -Install carrier pipe, including all testing and sterilization (if awarded); -Restore disturbed areas and permanently stabilize exposed soil, and; -Clean up site. https://www.civcastusa.com/project/69de3b797890dc05ecd6798b/summary lsolano@leadllc.com