SW 19th Knoll Stormwater Improvements
BID DATE
05/27/26 - 7:00
AGENCY
Bend
ESTIMATE
n/a
SCOPE
The Project includes, but is not limited to, 233 lineal feet of 8-inch stormwater pipe, ten catch basins, three combination sediment manhole catch basins, along with two drill holes. The Project also includes 350 square yards of reconditioning of the existing roadway, 41 tons of 3½-inch Asphalt Concrete Pavement (ACP) Mixture, 240 lineal feet of concrete curb, 648 square feet of concrete walks, and traffic control. https://bendoregon.bonfirehub.com/opportunities/231494