Access the Full Project by Clicking here!
Bidjugde
JOB
US 12 W Gulch Bridge Rimrock Retreat Paving
BID DATE
05/6/26 - 4:00
AGENCY
WSDOT
ESTIMATE
$12,000,000
SCOPE
Requires planing bituminous pavement, crack sealing, paving with hot mix asphalt (HMA) pavement, constructing reinforced slopes; removing existing overlay from bridge deck, expansion joint modification, bridge deck repair, HMA joint seal at bridge end, and installing waterproof membrane at Bridge 12/289; removing existing overlay from bridge deck and constructing HMA joint seal at bridge end at Bridge 12/288, Bridge 12/304, and Bridge 12/306; installing concrete barrier and guardrail, replacing rumble strips, shoulder finishing, fog sealing, delineation, traffic control and other work. https://wsdot.wa.gov/business-wsdot/contracting-opportunities/us-12-w-gulch-bridge-rimrock-retreat-paving wsdotscpeosouthprebid@wsdot.wa.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT