Access the Full Project by Clicking here!
Bidjugde
JOB
67th Sewer Interceptor Upsizing
BID DATE
05/5/26 - 7:00
AGENCY
Arlington
ESTIMATE
$2,150,000
SCOPE
Work shall include traffic control, sewer bypass system, pavement saw-cutting and removal, trench excavation, gravity sewer pipe and manhole upsizing and replacement, side sewer locating, side sewer reconnection, force main reconnection, surface restoration including trench patch, testing and all other incidental work for a complete upsizing of the 67th Ave Sewer Interceptor. https://www.arlingtonwa.gov/bids.aspx?bidID=170 ltaylor@arlingtonwa.gov
PREBID
4/23/2026 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT