Access the Full Project by Clicking here!
Bidjugde
JOB
Harbor Pointe Boulevard Pavement Preservation
BID DATE
05/5/26 - 7:00
AGENCY
Mukilteo
ESTIMATE
$2,015,000
SCOPE
The Work to be performed under these Specifications consists of furnishing all labor, tools, materials, and equipment necessary for construction of the HARBOUR POINTE BLVD PAVEMENT PRESERVATION with pavement preservation improvements that include planning and overlaying Harbour Pointe Boulevard with Hot Mix Asphalt (HMA). The Base Bid includes erosion control measures, traffic control, removals, Storm installation, utility adjustments, curbing, sidewalk and curb ramps, pavement markings, vehicle detection loop replacement, relocation of a rectangular rapid flashing beacon system, signing, fog sealing and other Work. http://bxwa.com/bxwa_toc/pub/1661/muk22_harbor_pointe_boulevard_65101/info.php lthornton@mukilteowa.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT