Access the Full Project by Clicking here!
Bidjugde
JOB
Moses Lake Stormwater Pump Station
BID DATE
05/13/26 - 8:00
AGENCY
Texas City
ESTIMATE
n/a
SCOPE
This project involves the installation of a high-capacity stormwater pump station intended to pump water from Moses Lake into Galveston Bay. Moses Lake and Galveston Bay are separated by a USACE hurricane protection levee that encircles a large majority of the City of Texas City. The proposed pump station would have a total capacity of 136,000 gallons per minute, using the four (4) engine-driven stormwater pumps and four (4) diesel engines, and accessories purchased by the City as part of a separate project. https://www.texascitytx.gov/bids.aspx?bidID=90
PREBID
4/29/2026 8:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT