Access the Full Project by Clicking here!
Bidjugde
JOB
Phase 3B Liner Expansion Savage Canyon Landfill
BID DATE
05/7/26 - 4:00
AGENCY
Whittier
ESTIMATE
n/a
SCOPE
The Work will consist of mass excavation; subgrade preparation; earthwork; installation of high density polyethylene (HDPE) geomembrane, geosynthetic clay liner (GCL), geocomposite, geotextiles; installation of HDPE, corrugated metal pipe (CMP) piping; construction of surface water control structures; and asphalt concrete paving. https://www.cityofwhittier.org/Home/Components/RFP/RFP/1329/1309

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT