Access the Full Project by Clicking here!
Bidjugde
JOB
City Fresno Pave More Now Bid Package B2
BID DATE
05/19/26 - 8:00
AGENCY
Fresno
ESTIMATE
$14,282,000
SCOPE
The scope of work includes but is not limited to; pavement rehabilitation at ten (10) separate locations – Teilman-Clinton-Fruit-University block, Shaw Avenue, Ingram Avenue, Nees Avenue (two area locations), Dakota Avenue, SantaAna-First Gettysburg-Augusta block, Church Avenue, Sixth Street, and Perrin Avenue. The work to be performed will be asphalt concrete grind and overlay with full depth reconstruction at isolated areas, curb ramps reconstruction, sidewalk and curb & gutter repairs, replacement of roadway striping, installation of advance stop bars, replacement of traffic signal loops at affected intersections, and adjustment of water valves and manhole lids to match proposed pavement grades. https://vendors.planetbids.com/portal/14769/bo/bo-detail/140890 Purchasing@fresno.gov
PREBID
5/5/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT