Access the Full Project by Clicking here!
Bidjugde
JOB
Sleepy Hollow Waterline Replacement Phase II (REBID x2)
BID DATE
01/14/16 - 2:00
AGENCY
Chino Hills
ESTIMATE
$900,000
SCOPE
REBID RESULTS: Rich Construction$862,300 38201 Palo Alto Murrieta CA 92562 Phone: 951-600-9742 Fax: 951-600-7582 Hemet Mfg Co (Genesis)$890,777 170 E. Oakland Ave. Hemet CA 92543 Phone: 951-652-6977 Fax: Cedro Construction$897,311 120 E. Santa Maria St. Santa Paula CA 93060 Phone: 805-525-0599 Fax: Tekton Construction Ent$933,685 4727 West 1st St Santa Ana CA 92703 Phone: 626-797-8590 Fax: TBU Inc.$939,800 240 Maple Ave Beaumont CA 92223 Phone: 951-769-0647 Fax: Miramontes$973,600 14241 Proctor Ave. La Puente CA 91746 Phone: 626-330-1043 Fax: Ferreira Coastal Construction$1,009,125 15188 Vista Del Rio Ave Chino CA 91710 Phone: 909-606-5900 Fax: 909-606-7711 Gentry Brothers$1,255,000 384 E Live Oak Ave Irwindale CA 91706 Phone: 626-357-9631 Fax: Sully Miller Contracting Co.$1,620,182 135 S. State College Blvd. Brea CA 92821 Phone: 714-578-9600 Fax: 714-578-9672 mobilization, traffic control, installation of 1,950 L.F. of 12-inch C900 CL 200 PVC pipe by either open trench or horizontal directional drilling method, 160 L.F. of 12-inch DR11 HDPE pipe by horizontal directional drilling method and 195 L.F. of 8-inch DR 9 HDPE pipe by horizontal directional drilling method; furnishing and installation of two-way Altitude Valve, and other related appurtenances as identified on the project plans and specifications.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT