Alteration Olive Ave Rail Crossing Olive Ave Widening Utility Undergrounding
BID DATE
05/5/26 - 7:00
AGENCY
Novato
ESTIMATE
n/a
SCOPE
The work to be done includes but is not limited to alterations to the existing Olive Avenue Rail Crossing and must be completed in compliance with California Public Utilities Commission (Commission/CPUC) General Order 88-B. Installation of three Omega concrete crossing panels; two modified junction boxes; two foundations for future pedestrian automatic gate arms; custom wing walls; relocation of vehicular automatic gate arm including new foundation; 4’ x 5’ chain link fence panel Z gates (typical of 2) with required signage; installation of two stencils – watch for train; 4’ chain link fence; truncated domes; sidewalk / 10’ wide concrete pedestrian pathway, curbs & gutters; placement of hot mix asphalt - roadway widening; K-rail; electrical pull box and two 4” conduits for future connection; 24” stop limit line; installation of new traffic signs and other items or details not mentioned above that are required by the contract documents. pskala@novato.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT