JOB
South Supply Line Phase 3
BID DATE
04/29/26 - 8:00
AGENCY
Bullhead
ESTIMATE
n/a
SCOPE
The Project involves the installation of approximately 4700 feet of 16-inch transmission main per drawings and specifications. This project also includes an additive alternative to install approximately 1450 feet of 10-inch distribution main per plans and specifications. The alternative is to be installed in the same trench as the transmission main. nbogenschild@bullheadcityaz.gov