Access the Full Project by Clicking here!
Bidjugde
JOB
Boeckman Creek Sewer Interceptor Trail
BID DATE
05/6/26 - 9:00
AGENCY
Wilsonville
ESTIMATE
$1,300,000
SCOPE
For gravity sewer interceptor pipeline upsizing, approximately 1.4 miles in length, and extension of a 10-foot to 12-foot wide regional bike and pedestrian trail and paved pipeline maintenance access along the Boeckman Creek corridor between Boeckman Road and Memorial Park. The scope of work includes advancing the existing advanced (60%) engineering to final design and preparation of construction documents for open trench and trenchless sewer pipeline installation, drainage pipeline installation, regional trail extension, environmental assessment and permitting, geotechnical evaluation, slope stabilization, tree evaluation and protection, stream and natural area restoration, public engagement, cost estimating, bidding assistance, construction support, and other related services. https://www.wilsonvilleoregon.gov/engineering/page/boeckman-creek-sewer-interceptor-trail-project-2107

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT