Access the Full Project by Clicking here!
Bidjugde
JOB
Rainier Ave South Stormwater Pump Station Upgrade
BID DATE
04/23/26 - 5:00
AGENCY
Renton
ESTIMATE
$1,710,000
SCOPE
To construct the Rainier Ave South Stormwater Pump Station Upgrade Project. The work involved under the terms of this contract document shall be full and complete installation of the facilities, as shown on the plans and as described in the construction specifications, to include but not be limited to: - Construction surveying, staking, and production of as-built plans. - Installing and maintaining adequate TESC measures and restoring all disturbed areas. - Temporary traffic control measures in accordance with the contract documents and applicable City of Renton and MUTCD standards. - Installation of 60-kW natural gas emergency generator and supporting power and telemetry panels. - Approximately 205 lineal feet of retaining wall and footing drain connection with existing storm system. - Concrete site work including concrete stairs and pedestal to support new generator and equipment. - Two new stormwater pumps, discharge pipes and gate valves. - Maintenance improvements to existing pump house including hoist monorail and winch system, new door opening, and enlarged floor grate. - Trench excavation, including removal of existing unsuitable material, and disposal of excavated material. - Removal of sidewalk, curb and gutter, and site work associated with the pump station upgrades. http://bxwa.com/bxwa_toc/pub/299/ren88_rainier_ave_south_stormw_52675/info.php cjeszeck@rentonwa.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT