Access the Full Project by Clicking here!
Bidjugde
JOB
2026 Sidewalk Gaps
BID DATE
05/6/26 - 4:00
AGENCY
North Bend
ESTIMATE
$975,875
SCOPE
There are three (3) sites associated with this project. The work to be performed shall be along the north side of SE Cedar Falls Way from the RRFB crossing located east of Stilson Ave SE to the existing sidewalk at the Cottages at North Bend Development frontage; the east side of SE Orchard Dr from SE 5th St to Orchard Place Townhomes; and the west side of 436th Ave SE from the roundabout at SE 136th St to the roundabout at SE North Bend Way. The Work will consist of, but is not limited to, sidewalk, curb and gutter, bike ramps, curb ramps, surface restoration including construction of a parking lot, storm drain collection and conveyance, JUT construction and other Work as required to complete the Project. http://bxwa.com/bxwa_toc/pub/3418/nb27_2026_sidewalk_gaps_projec_91083/info.php mmayen@northbendwa.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT