Rocky Creek Replacement Sewer Phase 3
BID DATE
03/24/26 - 7:00
AGENCY
Greenwood Metro District SC
ESTIMATE
n/a
SCOPE
The work consists of installing approximately 2,560 feet of new 18-inch and 24-inch gravity trunk sewer and 165 feet of new 10-inch and 12-inch gravity connector sewers; installing approximately 5,675 feet of new 10-inch force main sewer; installing approximately 16 new precast concrete manholes; installing approximately 5 new air release valves and manholes; crossing Rocky Creek (and tributaries) in 3 locations; crossing 5 roads via bore-and-jack; coating approximately 93 vertical feet of manholes using H2S resistant cementitious mortar; installing soil and erosion control devices; performing complete restoration as required; performing bypass pumping as necessary; and performing all other miscellaneous work required to complete the Project. DBerry@chasolutions.com https://gmdsc.gov/bid-opportunities/