JOB
Gardi A33 A35
BID DATE
05/7/26 - 9:00
AGENCY
Denver International Airport
ESTIMATE
n/a
SCOPE
This project will rehabilitate the apron airfield pavement at Concourse A, Gates A33 & A35 from the Q4 of 2026 through Q1 of 2027. Construction scheduling will be coordinated with DEN Airline Affairs and DEN Operations to minimize operational disruptions to DEN Airlines. The pavement rehabilitation includes full depth pavement reconstruction and the installation of a drainable base layer. The pavement reconstruction will take place from the Concourse building face to the outer Vehicle Service Road (VSR) trench drain and will re-establish positive drainage of the apron. In addition to pavement reconstruction, various gate apron utilities will be rehabilitated and replaced as necessary. Possible utility improvements include jet fuel hydrant pits, potable water cabinets, Emergency Fuel Shut Off (EFSO) infrastructure, storm drainage infrastructure, sanitary sewer infrastructure, Denver Water vaults and fire-hydrants, and various passenger loading bridge enhancements, as required. https://www.bidnetdirect.com/colorado/solicitations/open-bids/GARDI-A33-A35/0000419098?purchasingGroupId=8409951&origin=2 contract.procurement@flydenver.com
PREBID
4/14/2026 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT