Access the Full Project by Clicking here!
Bidjugde
JOB
Valley View Water Consolidation
BID DATE
06/4/26 - 7:00
AGENCY
Coachella Valley Water District
ESTIMATE
$16,800,000
SCOPE
The project consists of installing approximately 800 linear feet of 32-inch diameter fusible high density polyethylene (HDPE), 2,070 linear feet of 30-inch, 5,410 linear feet of 24-inch, 3,330 linear feet of 12-inch, 2,180 linear feet of 8-inch diameter water main pipe with restrained joints, including valves, fittings, polyethylene encasement, testing, disinfection, clearing and grubbing, excavation, imported sand, backfill and compaction of backfill, potholing all utility crossings, surface restoration and all necessary appurtenances complete and in place. The pipeline work also includes: excavation of jacking and receiving pits, shoring of trenches and pits as required, pipe jacking operations, horizontal directional drilling (HDD), and all related backfill and compaction. Portions of the pipeline will cross below ground the Union Pacific Railroad within a steel casing and the Coachella Valley Stormwater Channel (HDD) as indicated in the Contract Documents. https://vendors.planetbids.com/portal/16339/bo/bo-detail/140615 mzamora@cvwd.org
PREBID
4/27/2026 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT