Access the Full Project by Clicking here!
Bidjugde
JOB
Alder St Bridge Water Main Replacement
BID DATE
04/30/26 - 7:00
AGENCY
Moses Lake
ESTIMATE
$175,000
SCOPE
This project consists of replacing approximately 232 lineal feet of 12” Steel Water main with 96 lineal feet of 12” DI Water main and 136 lineal feet of Thermacor Ferro-Therm 12” Pre-insulated DI Water main. Contractor will connect the new water main at existing connection locations on each side of the Alder Street Bridge. Contractor will install the portion of the water main under the bridge in existing brackets and holes in concrete supports. The removal of the existing pipe will require additional care as asbestos is present in the pipe coating associated with the insulation under the bridge. The contractor will need to prepare pavement on either side of the bridge with saw cutting of asphalt, curb and gutter, in addition to removal and restoration of sidewalk panels, curb and gutter, guardrails, with final restoration of 34 square yards of HMA patching associated with the trenching area. Fencing below the bridge will need to be removed for pipe installation and restored after all work below the bridge is complete. https://www.cityofml.com/bids.aspx?bidID=176 nmickelson@cityofml.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT