Access the Full Project by Clicking here!
Bidjugde
JOB
Hallsville I S D Bus Barn Parking Area Expansion
BID DATE
04/22/26 - 7:00
AGENCY
Hallsville I.S.D.
ESTIMATE
n/a
SCOPE
The project consists of site development, drainage infrastructure, security fencing, and a structural building extension to the existing Hallsville ISD Bus Barn facility. General Conditions: Mobilization, bonds, insurance, construction staking, traffic control, and SWPPP permitting and implementation. Demolition, Site Preparation & Earthwork: Clearing and grubbing of approximately 3 acres; removal of existing pavement, curb and gutter, and chain link fencing; mass earthwork including excavation, select fill, and compaction for site and building pad areas; topsoil replacement and hydromulch on all disturbed areas. Paving & Site Improvements: Subgrade preparation and 6" medium duty concrete pavement for bus circulation and parking (approx. 7,736 SY); concrete curb and gutter; pavement striping. Fencing & Access Control: Approximately 683 LF of 8' wrought iron perimeter fence; one 32' manual slide gate; one 32' and one 30' motorized slide gate with operators and controls. Stormwater Drainage: 15" and 24" HDPE storm drain pipe; concrete curb inlets; junction box; headwalls with energy dissipators; safety end treatments and riprap. Site Electrical & Lighting Conduit: Conduit, pull boxes, and appurtenances for site lighting and gate control systems per plans. Bus Barn Extension Building: 243' x 85' (approx. 20,655 SF) structural addition including foundations, slab on grade, steel framing, corrugated metal roof, exterior painting, lighting, and IT conduit rough-in. https://www.civcastusa.com/project/69c6e03fc3c022e4242cb725/summary bradp@johnsonpace.com
PREBID
4/7/2026 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT