Access the Full Project by Clicking here!
Bidjugde
JOB
East WWTP Northside CMU Wall
BID DATE
04/20/26 - 7:00
AGENCY
San Luis
ESTIMATE
n/a
SCOPE
This project consists of the construction of new concrete masonry unit (CMU) wall along the north side of the East Wastewater Treatment Plant, located near East San Luis, County 24th Street and Ave D. The work includes furnishing all labor, materials equipment, and incidentals necessary to construct approximately 660 lineal feet of CMU Wall, with a height of 6 feet and block width of 8 inches. The scope of work includes, but is not limited to, site preparation and staking of the wall alignment, excavation and construction concrete footing as required, installation of CMU block, reinforcing, grout, concrete and all necessary materials as required for structural integrity. Contractor will coordinate with City staff entrance to the site, and to maintain continuous security of the facility throughout construction. acifuentes@sanluisaz.gov https://procurement.opengov.com/portal/sanluisaz/projects/251353/document?section=2404136

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT