Access the Full Project by Clicking here!
Bidjugde
JOB
Firestone Boulevard Bridge Widening over the Los Angeles River
BID DATE
12/15/15 - 11:00
AGENCY
South Gate
ESTIMATE
$5,700,000
SCOPE
The Project is located on Firestone Boulevard between Rayo Ave and the I-710 freeway, over the Los Angeles River. The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Specifications and Contract Documents. The general items of work include the portion of the bridge removal, construction of a new bridge, construction of new roadway pavement and associated signing, striping, lighting, providing for staged construction, and providing storm water pollution prevention controls. Hany Henein Senior Civil Engineer (323) 563-9581 hhenein@sogate.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT