Access the Full Project by Clicking here!
Bidjugde
JOB
St Lukes Detention Basin
BID DATE
04/29/26 - 7:00
AGENCY
Sacramento
ESTIMATE
n/a
SCOPE
The project consists of installing a custom precast 7-foot by 10-foot vault within Center Parkway and connecting it to the existing 21-inch storm drain pipeline; installing approximately 400 linear feet of 36-inch storm drain pipe and a new manhole; performing clearing and grubbing; excavating and constructing a new detention basin; constructing an inlet/outlet structure, drive ramp, and low-flow channel; installing new security fencing and gate; modifying the existing wrought iron fence and installing a new gate; constructing an asphalt access driveway and aggregate base (AB) covered access road; and performing site restoration and restoration of the City right-of-way. The Contractor shall furnish all labor, materials, tools, equipment, transportation, and incidentals necessary to complete the Work, including obtaining all required permits; preparing and implementing a sediment and erosion control plan; identifying and using an approved haul route; hauling and disposing of excess materials; and paying all associated fees. https://vendors.planetbids.com/portal/15300/bo/bo-detail/140382 pwright@cityofsacramento.org
PREBID
4/15/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT