Access the Full Project by Clicking here!
Bidjugde
JOB
Rawhide Trail Phase 3
BID DATE
04/15/26 - 3:00
AGENCY
Farmers Branch
ESTIMATE
n/a
SCOPE
The City of Farmers Branch is undertaking a project to widen a section of a popular concrete trail to enhance its usability and accommodate more users. The existing trail, currently 8 feet wide, will be replaced with a new 12-foot-wide trail. The new trail alignment has not been surveyed but has been walked and visually assessed by City staff. The project will involve additional tasks, such as excavating, removing trees, elevating low spots, replacing barrier-free ramps, and relocating dirt as needed. It is important to note that replanting of trees and sodding are excluded from the scope of this project. Given the trail's popularity, the project will be executed in phases to minimize disruption to users. The aim is to keep as much of the trail open as possible, closing only sections that are actively being worked on. Additional considerations include stormwater control and implementing light traffic control measures in the adjacent low-traffic residential area. Clean-up of materials upon completion is expected. This phased approach not only ensures safety and accessibility for the public but also facilitates a smoother construction process. Additionally, this project will include procuring and installing solar lighting adjacent to the new trail. https://www.civcastusa.com/project/69c5b46a452b29587672c111/summary maria.minter@farmersbranchtx.gov
PREBID
4/8/2026 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT